Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P14

Finance Committee - Agenda - 5/3/2016 - P14

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

G. Color: Black

2.02 _ TOP LAYER

A. Primer: Polyurethane.

B. Poured In Place Top: Blend (82% rubber & 18% polyurethane) of recycled EPDM
(ethylene propylene diene monomer) and polyurethane. Nominal thickness of 0.5", with
a minimum 0.325" and a maximum 0.625".

G Colors: Terra Cotta Red, Primary Red, Orange {indoor only), Pink, Gold, Beige, Yellow,

Bright Green, Army Green, Hunter Green, Teal, Sky Blue, Royal Blue, Purple, Pearl,

Eqqshell, Brown, Light Gray, Dark Gray, Black. Custom colors and combinations available

(specify).

PART 3 — Execution

A. Comply with the instructions and recommendations of the surfacing manufacturer.

3.01 EXAMINATION

A. Verification of Site Conditions: Verify that substrate conditions are suitable for
installation of the poured in place surfacing. Do not proceed with installation until
unsuitable conditions are corrected.

B. Drainage: Proper drainage is critical to the longevity of the surfacing system. Inadequate
drainage will cause premature breakdown of the poured system in affected areas; and
void the warranty.

3.02 PREPARATION

A. Existing Substrate Preparation: Remove any loose or delaminated material that would be
deleterious to application of the new surface. Fill cracks in existing concrete with
cementitious patching compound.

B. Surface Preparation: Using a brush or short nap roller, apply primer to the substrate
perimeter and any adjacent vertical barriers (such as playground equipment) at the rate
of 300 ft2/gal.

3.03 INSTALLATION

A. Do not proceed with playground surfacing installation until all applicable site work,

including substrate preparation, fencing, playground equipment installation and other
relevant work, has been completed.

5 ADDENDUM 2