COST OR PRICE SUMMARY FORMAT FOR SUBAGREEMENTS UNDER NH SAG & SRF
Form Approved
DES 02/06
PART I - GENERAL
1. GRANTEE / LOANEE
City of Nashua, New Hampshire
2. GRANT/LOAN NO.
3. NAME OF CONTRACTOR OR SUBCONTRACTOR.
Woodard & Curran, Inc.
4. DATE OF PROPOSAL
Wednesday, Apri] 20, 2016
41 Butchins Drive
Portland, Maine 04102
§. ADDRESS OF CONTRACTOR OR SUBCONTRACTOR (Include ZIP}
6. TYPE OF SERVICE TO 8E FURNISHED
Engineering Study and Design
PART II - COST SUMMARY
HOURLY ESTIMATED
7. DIRECT LABOR (Specify labor categories) HOURS RATE COST a TOTALS
Principle in Charge / Client Manager 68 $67.73 $4,606 | Pace ed ae
Project Manager 64 $58.10 $3,718
Planner a4 $48.16 $4,046 | 3 1
Technical Manager 1% $51.48 $3912 foe 07. .
Lead Project Engineer 196 $48.16 $9,440
Project Engineer 172 $45.15 $7,766
Staff Engineer, Process 248 $33.11 $8,212 |
Project Engineer, Electrical 186 $41.84 $7,783 ,
Seniot Engineer, Structural 8 $58.10 $465
Staff Engineer, Structural 43 $36.72 $1,763
Senior Engineer, SCADA 114 $51.48 $5,968
Project Engineer, SCADA 68 $46.66 $3,173 |, ‘
Sr. Cost Estimator 152 $48.16 $7,321 |}. = :
Senior Gesigner 288 $39.13 $11,270 | ‘.
Designer 40 $31.61 $1,264
Staff Engineer, SCADA 196 $33.11 $6,490
Sr. Technical Advisor 40 $63.21 $2,529 ‘ a
Funding Specialist GQ $48.16 $0 = hes
Project Assistant 56 $21.67 $1,214 oi
DIRECT LABOR TOTAL: o ui he's $90,839
RATE X BASE = ESTIMATED Capri
8. INDIRECT COSTS (Specify indirect cost poots) Eos : tes.
2.02 $90,839 $183,495 | cy
INDIRECT COSTS TOTAL: $183,495
9. OTHER DIRECT COSTS oom
a. TRAVEL ESTIMATED
COST :
(TRANSPORTATION $10,636
(2)PER DIEM
TRAVEL COSTS TOTAL: $10,636
b. EQUIPMENT, MATERIALS, SUPPLIES (Specify categories) ESTIMATED
QTY COST oo
Fieid Supplies jump $8,250 $8,250 |-
City of Nashua (228730. 1¢)
2016.05.2 Pump Stations Upgrade Prelim Design Centract