Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/15/2016 - P204

Finance Committee - Agenda - 6/15/2016 - P204

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/15/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/15/2016 - 00:00
Page Number
204
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__061520…

ENGINEERING REPORT, DESIGN & BIDDING PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY OF NASHUA, NEW HAMPSHIRE

This AGREEMENT made and entered into at Hillsborough County, New Hampshire, this
_ day of 2016, by and between City/Town of Nashua, hereinafter called the OWNER, and
Woodard & Curran, hereinafter called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to construct Treatment Works as described within the Request for
Qualifications titled “Pump Stations Upgrade Project (RFQ1090-052215)” and dated May 6, 2015
consisting of performing a field study of all (14) pump stations to development the upgrade option for each
of the stations including the potential for elimination, relocation and reconfiguration as well as upgrading
each station for integration into the OWNER’s Supervisory Control and Data Acquisition (SCADA)
system. A preliminary design will be provided based on the field study results. Final design and bid copies
will be provided for the upgrade to each of the fourteen pump stations generally known as the: Pump

Stations Upgrade Project hereinafter called the PROJECT, and

WHEREAS, professional sanitary engineering services will be required for the preparation of plans

and specifications and contract documents, and

WHEREAS, such services are of a distinct professional nature and hence not subject to the bidding

process,

NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set
forth, the OWNER hereby employs the ENGINEER to furnish the following engineering services in
connection with the proposed PROJECT; and it is agreed by and between the OWNER and the ENGINEER

as follows:

2016.05.27 Pump Stations Upgrade Prelim Design Contract 02/08/06

Page Image
Finance Committee - Agenda - 6/15/2016 - P204

Footer menu

  • Contact