Standard Specifications and Special Provisions EXHIBIT B
Concord Street Crosswalk Improvements
Date: June 7, 2016
All Items that are not included in the special provision shall comply with the latest approved NHDOT
Standard Specifications for Road and Bridge Construction, the latest approved City of Nashua Standard
Specifications for Road Construction Sewer and Drains, the latest approved NHDOT Standard Plans for
Construction and the latest approved edition of Manual of Uniform Traffic Control Devices.
Special Provisions
ITEM A - Installation of XD “Brick” Pattern Crosswalks.
A. SCOPE
This work shall consist of installing 2005 square feet of “TrafficPatternsxXD™ Brick” Pattern Stamped
Asphait for crosswalks on Concord Street at six intersections including Manchester Street, Laton Street,
Courtland Street, Hall Avenue, Columbia Avenue and Bartlett Avenue as shown on the Concord Street
Crosswalk Improvements (Drawings 1 to 3} plan or as ordered by the Engineer. The plan shows the
proposed location of the crosswalks. The location may change based on the as-built conditions of the
constructed bump-outs at these intersections.
B. MATERIALS AND CONSTRUCTION
The Contractor shall furnish labor, equipment, and material necessary for installing TrafficPatternsxD™
“Brick” Pattern crosswalks. This work will be conducted at during day time and the Contractor wiil be
responsible for providing traffic control. All required milling and paving work to prepare asphalt pavement
surface will be performed by the City.
Crosswalks shall be installed in strict conformance with the plan provided, current Americans with
Disabilities Act (ADA) and City of Nashua regulations.
c. MEASUREMENT AND PAYMENT
The work will be measured by the square foot, complete in place. Payment for work under this item shall
be at the contract unit price per square feet and shall include traffic control necessary for the completion
of this work specified.
Page | 1