Tore on Chenitlenima WRONG Wine Paile-Cond me AO7TH BSA heFEAS RAT STUY
ST: PED, BRIIGE OVER CANAL uk, By BTUSAn
® FEASIEALITY STUDY Check By = WL
anna
TOTAL
PROUECT | PROJECT | ocePLye SEANOR BENIDR -Amnn cano com ADMINIS TRATHE TOTAL OWECT
MANAGER E | MANAGER! LEAD ENGNEER & ENGINEER | E COORDINATOR & TECHNICIAN || PROFESSIONAL | HOURE COSTS
TASK DESCRIFTOAS S5a77 S47 op sim 4417 a5 338,02 am $3807 maa on 325.50
EXPENSES: MIRECT LABOR COSTS:
TRAVEL-UREAGE, ETC. TOTAL CARECT LABOR
POSTAGE & COMMUNICATION OVERHEAD AND PAYROLL BURDEN
PRINTING TOTAL DIRECT LABOR AND OVERHEAD
LODGING AND MEALS
TESTING EQUIPMENT RENTAL FIXED FEE:
SUBTOTAL ONECT LABOR A BLED FEE:
SUBCONSULTANTS:
AASTORIC DOCUMENTATION COMPANY, INC. nokadea admin fee ol on
MILLER ENGINEERING 4 FES TING, IAC.
DOUGET SURVEY
TES
(6UBCOMSULTANT] . SUBTOTAL ORECT LABOR, FLED REE, RUBCONEULTANTS:
REMBUA SAB F EXPENSES:
Weteies ct in feed *
TOTAL:
Dain - 1227