will instead be covered by the AoT General Permit by Rule in accordance with RSA 485-
A:17. The current fee does not include costs for services relating to Preparation or
submittal of a Site Specific AoT permit. As such, a pre and post condition hydrology
analysis will not be performed. Structural Best Management Practice (BMP) design
services are also not anticipated to be required.
e A Conditional Letter of Map Revision (CLOMR) is not required. A Letter of Map Revision
(LOMR) may be required upon the completion of construction, and is not included in this
proposal.
e Bidding Requirements, Contract Documents and Technical Specifications developed for
the project will be based upon Hoyle, Tanner's standard which is based upon the EJCDC
2013 model documents together with modifications requested during the process
described in F-3 above,
e Should new or revised environmental permitting requirements be enacted subsequent to
the execution of this Agreement, the fee may be renegotiated..
« The proposal assumes a maximum of 2 minor addendums will be issued.
e Contract Documents will consist of a bound book entitled “Bidding Requirements Contract
Documents and Technical Specifications” and full-size (22” x 34") plans.
e The Quality Assurance Program will follow the guidelines contained in the “NHDOT Quality
Assurance Program for Municipally Managed Federal-Aid Projects” and will generally
include the following services:
o Preparation of a Quality Assurance Program plan for the project.
o Preparation of a Construction Project Records Lab Book (Lab Book) which will
include the Quality Assurance Program and copies of all field and/or lab test
results. The lab book will also include copies of testing technicians credentials and
photographic ID.
Administration of subconsultants to complete the required testing for the project.
Off-site earthwork material sampling and testing and on-site testing.
On and off site concrete testing.
Structural steel shop inspection and weld testing.
oo 0 0