comments shall be made on sewer conditions and other data of significance including the locations of
unusual conditions, cracks, misalignments, collapsed sections, presence of debris and deposits and other
discernable features.
GIS node numbers shail be used to identify every manhole and catch basin for videaing, cleaning, and
inspection. Node numbers can be obtained from Gi{S on the Cities website. Same structures may not
have GIS node ID’s. The report shall indicate when that is the case.
A sample report shail be submitted to the City and approved by the City prior to commencement of
work.
Payment shall be per each (EA}. Each is defined as an entire street including all side streets. Eleven
entire streets are included in this contract. Therefore 11 submittals will be due.
Structure Report (Item 47-57)
The contractor shall provide color catch basin and manhole inspection report. Reports shall be provided
ona CD, DVD, or Flash Drive. Reports shall be in PDF format and contain images of the structure and
structure defects. Reports shall note items of concern (cracks, unsuitable brick work, broken pipe
connections, etc.}, and general conditions of the structures. Generally, structure inspections should
identify the same defects as in a MACP condition assessment.
GIS node numbers shall be used to identify every manhole and catch basin to be cleaned, and inspected.
Node numbers can be obtained from GIS on the Cities website. Some structures may not have GIS node
ID's. The report shall indicate when that is the case.
A sample report shall be submitted to the City and approved by the City prior to commencement of
work.
Payment shall be per each (EA). Each is defined as an entire street including all side streets. Eleven
entire streets are included in this contract. Therefore 11 submittals will be due.
(FA0844-060916 Sewer and Drain Pipe Inspection for Paving Program Page 5 of 11