Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/6/2016 - P148

Finance Committee - Agenda - 7/6/2016 - P148

By dnadmin on Mon, 11/07/2022 - 09:51
Document Date
Wed, 07/06/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2016 - 00:00
Page Number
148
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

Standard Specifications and Special Provisions
Main Street Sidewalk Improvements- Block 3 & 4 Brick Crosswalk

After the bricks are in place, when the brick is thoroughly dry, apply polysand as shown on the detail and
sweep into the joint voids around the bricks. Re-apply a minimum of three times until all the voids are
filled and sweep away all extraneous material.

Prior to acceptance, the brick paved area shall be flooded with water to assure that there are no
depressions. Remove and reset bricks as required until surface is true to line and grade. Refill sand-
cement joints as necessary until all joints are filled to finish grade.

Crosswalk shall be installed in strict conformance with the layout and grades shown on the Drawings,
current Americans with Disabilities Act (ADA) and City of Nashua regulations.

Cc. MEASUREMENT AND PAYMENT

Brick work will be measured by the square foot, complete in place. Payment for work under this item shall
be at the contract unit price per square feet and shall include full compensation for installing new bricks,
sand setting bed, poly-sand joint filler, labor, tools, equipment and any other incidentals necessary for the
satisfactory completion of this work as specified.

IFB0851-052616 Main Street Improvements —
Block 3 & 4 Brick Crosswalks
2({ Page

Page Image
Finance Committee - Agenda - 7/6/2016 - P148

Footer menu

  • Contact