Exhibit A
Nashua - Crown Street Park & Ride Project
Scope of Work and Task Descriptions
June 15, 2016
The following scope of work outlines the necessary tasks to be undertaken by McFarland-Johnson
(MJ) and its sub-consultants to determine the solutions, prepare plans, obtain permits, and
ultimately advertise the Crown Street Park and Ride project for construction. The project has been
organized into three specific tasks to take the project from planning through to construction.
Task 1— Engineering Study
1.1. Information Gathering
1.2 Detailed Survey
1.3 Resource Identification
1.4 Existing Structure Review
1.5 Public Involvement — Listening Session
1.6 Alternatives Development
1.7 Traffic Analysis
1.8 Public Involvement — Alternatives Workshop
1.9 Engineering Report
Task 2 — Preliminary Design
2.1. Preliminary Plans
2.2 Geotechnical Investigations
Task 3 — Final Design
3.1. Environmental Permitting
3.2 Preliminary Plans, Specifications and Estimate (PS&E)
3.3 Final Plans/Contract Documents
3.4 Bid Services
Page 1 of 12