Project Name: Nashua Bridge
port lighting 3
systems Exhibit B
Page 2 of 3
QTY Item
Description Unit
Cost
- |* Provide excavation, backfilling and reseeding of
trench from existing man hole to the ALCC
Under Bridge Lift:
Police Detail for lane closures:
{Aspen Aerials A-30 Under Bridge Inspection Unit.
* Provide coring of holes for new conduits into the
existing man hole
* Extend (1) 30 amp 240/120 volt feed from the
existing LC2 pedestal aprox. 1,000’+ to the new
ALCC
« Provide new conductors in the existing 3” conduit
from the LC2 to the existing man hole
« Provide ALCC cabinet mounted on pressure
traeted posts. No Stainless cabinet
* Provide conduits from the ALCC to the underside
of the bridge per drawings with power wires
* Provide junction boxes and mount the power
supplies per drawings
* Provide stainless steel hardware per plans
* Provide conduit from the junction boxes out to the
side of the bridge to provide a path way for the LED
lighting leader cable
* Provide expansion fittings as indicated
* Make power connections to each power supply
(power supplies provided by Port Lighting)
« All leader cables and Led lighting to be provided
and installed by Port Lighting
Electrical price assumes reuse of exiting unistrut
rack under the bridge. If new rack is required it can
be added for a fee .
Electrical Work Subtotal:
Lift required for working under the bridge.
Estimated at 1 week
Under Bridge Lift Subtotal:
$83,264.50
$11,000.00