Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/6/2016 - P13

Finance Committee - Agenda - 7/6/2016 - P13

By dnadmin on Mon, 11/07/2022 - 09:51
Document Date
Wed, 07/06/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2016 - 00:00
Page Number
13
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

Co

Integrated Security

Site Conditions:

Customer Expectations:

Training Expectations:

Customer Responsibilities / Tyco Exclusions:

Documentation Needs:

© TYCO 2015. ALL RIGHTS RESERVED

City of Nashua
11 Riverside St
Nashua, NH 03062

Estimate Name: City of Nashua DPW Admin CCTV 4-5-16

Existing site with hard ceiling and
crawlspace on the second floor for running
wire, see drawings

Installation shall take piace Monday - Friday
between 8am and 5pm

Tyco technician shall train end-user on
basic use of the system after installation is
complete

City of Nashua is responsible for the
following:

1. Provide (3) 120V electrical outlets in
close proximity to the NVR for the NVR,
Monitor and PoE switch.

2. Provide network connection at the
location of the NVR. If remote viewing is
desired, please provide a Static IP address
before installation begins.

3. Provide access to all areas required for
installation Monday - Friday between 8am
and 5pm

‘4, Be available during the camera sight-in

phase of the project to ensure camera views
are satisfactory |

5. Be available at the end of the installation
for end-user training with the Tyco
technician

Drawings

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 5 of 6

Page Image
Finance Committee - Agenda - 7/6/2016 - P13

Footer menu

  • Contact