ENGINEERING REPORT PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS
CITY OF NASHUA, NEW HAMPSHIRE
This AGREEMENT made and entered into at Hillsborough County, New Hampshire, this 3
of 20 , by and between City. of Nashua hereinafter called the OWNER, and
Woodard & Curran hereinafter called the ENGINEER,
WITNESSETH: PUR
_ WHEREAS, the OWNER intends to to examine the need" alternatives and cost of constructing Treatment
Works including potable water booster station described within the Request for Qualifications titled “Water
Booster Station Upgrades Project at NWTF (RFQ0265. 0603 1 6)” dated May 13, 2016 consist of preforming a
site study of the potable ve ater needs of, the plant to develop. an upgrade option for the existing underground
valve and pump vault. This includes ‘the potential elimination, relocation or reconfiguration as well as
upgrading for i integration into the OWNER’s ‘Supervisory Contro! and Data Acquisition (SCADA) system. A
e provided based on ‘the site stay results. Final design and bid copies will be
WHEREAS, suc
process, ae
NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set forth,
the OWNER hereby retains the ENGINEER to furnish the following engineering services in connection with
the proposed PROJECT; and it is agreed by and between the OWNER and the ENGINEER as follows:
NH DES Grant Report for WBS 2 02/08/06