Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2016 - P50

Finance Committee - Agenda - 8/3/2016 - P50

By dnadmin on Mon, 11/07/2022 - 09:50
Document Date
Wed, 08/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2016 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

tanley

svator Campany, inc,

QUALIFICATIONS:

The following qualifications and clarifications apply to this proposal and the prices quoted herein:

1.

2.

14.

15.
16.
17.
18.

19.
20.

21.

Means to keep the machine room between 50 and 90 degrees F will be required for the new
equipment. Costs to install a split unit or any HVAC required are by others.

Stanley has included costs for a crane to remove existing equipment and hoist the new
equipment onto the roof. Access for the crane will be required at the side of the building during
our crane picks.

We have included a TEN THOUSAND DOLLARS ($10,000.00) material allowance for elevator
cab interior upgrades. We have assumed the existing counterweight frame can be retained in its
current condition. If the counterweight frame needs to be modified due to added cab weights,
additional costs will apply.

No costs for card readers, CCTV, lockouts, etc. are included. Additional security features will
result in added costs.

No costs for emergency power operation or battery lowering are included. Stanley can provide
alternate pricing upon request.

Price will be held firm for Sixty (60) days from date of proposal.

Price does not include cost of performance / payments bond.

Price includes permit fees associated with elevator trades work.

Price includes required testing with local authorities for certification.

. All passenger elevator installation work to be performed during normal hours.

. All safety testing of elevators to be performed during normal hours of the trade.

. Price is based on performing renovation work on one elevator at a time.

. Price does not include cutting and patching of finished wall surfaces associated with our work.

The owner is responsible for cutting of the walls and stone to provide new openings for the new
elevator hallway fixtures.

All material associated with this project to be delivered to your loading dock facilities and
distributed to storage space within the building during normal hours of the trade.

Stanley Elevator to have uninterrupted use of the elevator.

Stanley Elevator will not be responsible for removal or disposal of hazardous material.

Stanley Elevator will not agree to act in the capacity of a General Contractor.

Stanley Elevator will provide a twelve (12) month warranty on parts and workmanship. During the
warranty period, we shall provide monthly maintenance visits.

Stanley Elevator Company, Inc. reserves the right to negotiate contract terms and conditions.
Costs for certification of elevator shop drawings by a registered professional engineer shall be
by others.

Stanley Elevator will furnish and install standard OSHA barricades for hoistway protection. Costs
for any full-height barricades, screening, and temporary protection of interior finishes in addition
to standard barricades shall be by others.

Page 9 of 13

_ Proposal # 6021

Ref Id: Mod-09686 - 6/22/2016

Page Image
Finance Committee - Agenda - 8/3/2016 - P50

Footer menu

  • Contact