81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
Fixture Style:
Digital Position Indicator:
Direction Indicator Lanterns:
Hoistway Access Stations:
Stanley
tor Company, Ine.
Manufacturer's Standard with Flush Coverplate And Full
Back Box, ADA Compliant
None
None
Replace With New
Phase | Firefighter's Svc Key Switch: Replace With New
Emergency Power Operation Switches: None
Emergency Medical Technician (EMT) Service:
None
Hospital Emergency Svc Operation: None
Car To Lobby Call Key Switch:
Lobby Panel:
Miscellaneous:
None
None
91. Barricading: Standard Sectional Barricades at Active Location
92. Hoistway Protection: Not Required
93. Cleaning: Final Clean Down at Project Completion
94. Painting: Machine Room Floor
SCHEDULE:
e Booking Process: 2 Week(s)
e Survey Job Site: 2 Week(s)
e Release Orders: 2 Week(s)
e Submittal Preparation: 4 Week(s)
e Approval Process: 2 Week(s)
e Material Fabrication: 12 Week(s)
¢ = Installation: 8 Week(s)
e ‘Installation (Final Testing): 1 Week(s)
e Final System Test/Punch List: 1 Week(s)
TOTAL: 34 Week(s)