Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/20/2022 - P149

Finance Committee - Agenda - 4/20/2022 - P149

By dnadmin on Sun, 11/06/2022 - 21:43
Document Date
Fri, 04/15/2022 - 11:50
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2022 - 00:00
Page Number
149
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

April 14, 2022

Pipe Crew Cost with (2) Oump Trucks (8 hour min.}
Traffic Control (Flaggers - 2 EA}
Police Details (if can fill; pass thraugh cost)

24" HDPE Pipe with Bedding/Backfill

15" SOR 35 Pipe with Bedding/Backfill plus Strongbacks
12" SOR 35 Pipe with Bedding/Backfilt

8" SDR 35 Pipe with Bedding/Backfill

12x8 Wye ; - a

4' Dia Catch Basin with Frame and Grate and CB Hoods
4' Dia Sewer Manhole with Frame, Cover and Invert
Flowable Fill (min. yardage}

Freight

Vibration Monitor
Vactor Truck

Light Tower Rental
Message Board Rental

4" Temp Pavement

7" Asphalt (Permanent)
Sawcut Pavement (estimated qty)
18" Crushed Gravel Base

Unclassified Excavation _

$.U.R. Construction West, inc.
Emergency Sewer Repair - Main Street & Water Street

Total Emergency Sewer Repair, plus Optional As Needed

Notes:

Quantity Unit Unit Price Total Price
60 HR 1,100.00 66,000.00
120 HR 40.00 4,800.00
1 ALLOW 5,000.00 5,000.00
20 LF 90.00 1,800.00
14 LF 115.00 1,610.00
80 LF 75.00 6,000.00
[23 le 60.00 1,380.00
2 EA [1,000.00 2,000.00
2 lea [1,700.00 3,400.00 =
i EA [2,850.00 2,850.00 j
4 cy 200.00 800.00
ja LS 750.00 [750.00 |
ia WK 600.00 |600.00
[2. [Night [2,300.00 4,600.00
la EA 450.00 1,800.00 i
2 [wk [350.00 {700.00
[4s TN {85.00 _|4,080.00
85, [tn “185.00 17,225.00
[300 UF 10.00 {3,000.00
178 Iev [35.00 {6,230.00
|221 CY includedincrewcost |
_____|124,625.00

|. Crew Cost to be invoiced based on actual time spent - this should | bea conservative amount of time

* Pipe materials are available including freight time by the end of this week; we can mobilize for a Monday 4/18 start

* Paving and excavation / crushed gravel and time is included here but we can break out that time if you prefer to pay it through bid items

Page Image
Finance Committee - Agenda - 4/20/2022 - P149

Footer menu

  • Contact