Scope of Work
Downtown Wayfinding Sign Package
RFP 0860-061616 July 20, 2016
FEE SCHEDULE Contract Hourly Billing Rates
Senior Vice President/Branch Manager 5250.00
Vice President/Project Director. $225.00
Assistant Vice President/Project Director 5185.00
Senior Project Manager $175.00
Senior Engineer $160.00
Project Manager _..9150.00
Project Engineer . _ $125.00
Senior Inspector/Coatings Inspector $110.00
Engineer/Inspector $100.00
Senior Technician 590.00
Engineering Technician $80.00
Technician __ _ $65.00
Administration 555.00
Court Testimony/Deposition Negotiated
REIMBURSABLE EXPENSES
Direct, Non-salary expenses will be billed at 1.2 times cost:
1. Transportation and living expenses incurred for assignments outside of the closest CONSULTANT
office, including the use of rental cars.
Shipping charges for plans, equipment, etc.
Purchase of specialized equipment and rental of equipment from outside vendors.
Reproduction of drawings and reports.
Construction materials and spent tools specifically for the project.
Automobile expenses for personal or company venicles wiil be charged at $0.50 per mile plus toll
charges for travel from the CONSULTANT office to the project and return and for travel at the job
in conduct of work. No mark-up of this charge.
7. Insurance in excess or in addition to insurance coverage’s or at limits not normally carried by
CONSULTANT or its subconsultants.
@ OF & Gh
Services of Others
On occasion, CONSULTANT engages the specialized services of others as subconsultants on the project. When
considered necessary in CONSULTANT’s sole discretion, subconsultants will be used. The CLIENT agrees to
reimburse the actual cost of these services plus a 20% service charge prior to the release of any work product
which involves subconsultants’ work.
Page 4 of 4