Owner’s schedule or budget for Cost of the Work, or bid packages in addition to those listed in
Section 1.1.6;
2 Making revisions in Drawings, Specifications, or other documents (as required pursuant to Section
6.7), when such revisions are required because the Construction Manager’s estimate of the Cost of the
Work, Guaranteed Maximum Price proposal, or Control Estimate exceeds the Owner’s budget, except
where such excess is due to changes initiated by the Architect in scope, cap tig s of basic systems, or
the kinds and quality of materials, finishes, or equipment;
3 Services necessitated by the Owner’s request for extensive sustainable desigh ali ernatives, such as
unique system designs, in-depth material research, energy modeling, or LEED ® certification;
4 Changing or editing previously prepared Instruments of Service necessitated: by the enactment or 7"
revision of codes, laws or regulations, or official interpretations; roeenenenta annonce
5 Services necessitated by decisions of the Owner or Construction Manager ndt rehdered in a timely
: manner or any other failure of performance on the part of the Owner or the @wner’s consultants or
contractors;
6 Preparing digital data for transmission to the Owner’s consultants and contratt@is, or to other Owner
authorized recipients; ' ro
7 Preparation of design and documentation for alternate bid or proposal requests proposed bye
Owner or Construction Manager;
8 Preparation for, and attendance at, a public presentation, meeting or hearing: i
‘9 Preparation for, and attendance at a dispute resolution proceeding or legal proceeding, exc =pt where os
the Architect is party thereto;
10 Evaluation of the qualifications of bidders or persons providing proposals; Ty
11 Consultation concerning replacement of Work resulting from fire or other ca useduring construction. |
12 Assistance to the Initial Decision Maker, if other than the Architect;
13 Services necessitated by replacement of the Construction Manager or conversion of the Construction - eee =.
Manager as constructor project delivery method to an alternative project delivery method; . ne a
14 Services necessitated by the Owner’s delay in engaging the Construction Manager; and
5 Making revisions in Drawings, Specifications, and other documents resulting from substi stitutions) i
included in the agreed to assumptions and clarifications contained in the Guardiifeed Maxifnum ry
Amendment or Control Estimate. i al
§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following AdditionahServices ee
notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the neednlf the sl
Owner subsequently determines that all or parts of those services are not required, the Owner shall give prompt sng
written notice to the Architect, and the Owner shall have no further obligation to compensate the Architect for those ~s
services
1 Reviewing a Construction Manager’s submittal out of sequence from the subgpfal sche schedu val a
by the Architect; fo
2 Responding to the Construction Manager’s requests for information that are jot heoareaty V ¥
accordance with the Contract Documents or where such information is availabl¢ to the Construction
Manager from a careful study and comparison of the Contract Documents, field conditions} other
Owner-provided information, Construction Manager-prepared coordination drawings, or ptior Project
correspondence or documentation; ines or PE P ‘
3 Preparing Change Orders, and Construction Change Directives that require dvaluation of the 4
Construction Manager’s proposals and supporting data, or the preparation or tevisior~of instruments
of Service;
4 Evaluating an extensive number of Claims as the Initial Decision Maker; ce
5 Evaluating substitutions proposed by the Owner or Construction Manager and mating ne subsequent
revisions to Instruments of Service resulting therefrom; or
6 — To the extent the Architect’s Basic Services are affected, providing Construction Phase Services 60 yor
days after (1) the date of Substantial Completion of the Work or (2) the antidipatéd date of Substantial 4
Completion, identified in Initial Information, whichever is earlier. | i
§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth bow as Additional
Services. When the limits below are reached, the Architect shall notify the Owner:
id-similar-submittals-of ——--» sie Deleted:
the Construction Manager
=f Deleted:
ATA Document B133™ - 2014. Copyright © 2014 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is.
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA” Document, or any
portion of it, may result in severe civil and criminal penalties, and will he prosecuted to the maximum extent possible under the law! 13
This draft was produced by AIA software at 12:43:58 on 07/15/2016 under Order No.1575871642_1 which expires on 02/08/2017, and is not for
resale.
User Notes: (1146770772)