City of Nashua, Public Works Division
Board of Public Works Meeting Date: August 25, 2016
Lisa Fauteux, Director
Administration Department
Burke Street — Programming and Conceptual Design
To approve the contract with HKT Architects, Inc. of Somerville, MA in the amount
of $144,509.25 for the programming and conceptual design of the Burke Street
facility. Funding will be through Department: 129 Buildings; Fund: City Buildings
Expendable Trust.
In order to be able to estimate project costs with reasonable confidence, several
programming and investigation tasks must be performed by the architectural team.
Overall space use will be evaluated to prepare a conceptual floorplan to serve as a
basis for the programming estimate.
Existing structural components will be measured and analyzed to determine the extent
to which structural modifications may be needed to comply with current building code
requirements.
A conceptual site plan will be prepared to provide a basis for estimating site costs.
The architectural team’s cost estimator will prepare a conceptual cost estimate of the
entire program based on the programming, investigation, conceptual design and
analysis performed.