Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/20/2022 - P127

Finance Committee - Agenda - 4/20/2022 - P127

By dnadmin on Sun, 11/06/2022 - 21:43
Document Date
Fri, 04/15/2022 - 11:50
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2022 - 00:00
Page Number
127
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

Bidder Location
St Petersburg FLA
Roth IAMS and Canada

Burlington VT,

Cx Associates Portland ME
LLB Architects Pawtucket, RI
Dennis Mires Manchester, NH

designLAB architects Boston, MA

NY, NY and San Juan,
Marvel Architects Puerto Rico

Subcontractors listed

None

None, will use in-house staff

AMM Fogarty Cost estimating
Nitsch Engineering

Roome and Guarracino Engineering
Building Engineering Resources
Universal Environmental consultants

Le Messurier: Building envelope
Fitzmeyer and Tocci: HVAC
Lumen Studios: lighting

C3 (code assessment)

RFS engineering (mechanical and electrica
Building enclosure associates (envelope)
Harvey construction (costing) : optional

Harvey Construction (estimating)

Similar projects for firm/staff

Bid evaluation: facilities assessment

Proposal cost

$7,250
South Burlington library energy consultant $26,750
Vermont Dept. of buildings energy audit
Boston Public Health Commission $76,157
Littleton Town Hall, Littleton MA
Marion Town Administration Building
Extensive list of library projects, mostly feasibility studies
Nashua Community College Wellness center design $85,650
Littleton Opera house assessment
Amherst, NH police station assessment
Greater Nashua YMCA design
Bishop Guertin building envelope analysis
BPL McKim building master plan $95,730
Brandeis Goldfarb library assessment (Includes
Homer Babbidge Library (Uconn) : master plan, plaza study optional)
Phillips Exeter Academy library master plan
Brooklyn Public Library $117,380

Fitzmeyer and Tocci (mechanical systems) Snug harbor cultural center and Botanical Gardens

RWDI (building envelope)

Available unrestricted Trust funds as of 8/31: $ 127,000

YMCA Northeast Bronx

*not clear that these are assessments based on contract prices

Optional services

none listed

$3,875
blower door testing

none listed

none listed

Cost estimating: 9500
Telecom/Security: 3600
Structural engineer: 3600
Total optional: $13,000

none listed

Notes on process/experience

This company seems to misunderstand the project, their
proposal includes gathering data to hold in an asset management system
more like database entries than a comprehensive master plan

Firm specializes in energy consumption and efficiency, focus on energy audits

Promises a 30% savings in energy consumption

Scope focuses on energy efficiency, evaluating building envelope, lighting and HVAC for efficiency
Does not mention finishes, flooring, lighting design and bathroom fixtures, ADA compliance, etc.

Extensive experience with libraries, thorough plan including meetings with stakeholders before assessment begins
Scope mentions all areas of concern although it refers to details from a different project in another community

Thorough assessment covers all of the elements mentioned in the RFP as well as
as lighting recommendations and an ADA review. Mentions potential for solar PB,
plumbing upgrades and solutions for air handlers other than full replacement.
Costing would be based on recent projects and knowledge of the market

Great experience with assessing library buildings and master plans for same.
Thorough plan outline: kickoff, interviews, review of docs, bi-weekly status meetings
Offers Harvey Construction as optional for costing estimates; | would recommend we add that if we chose this vendor.

Thorough plan outline, includes grounds and recommended maintenance, lighting review as well as
all mechanical systems, windows and electrical systems. Costing provided by Harvey

Page Image
Finance Committee - Agenda - 4/20/2022 - P127

Footer menu

  • Contact