e What is the time frame (start/finish dates) to allow for the temporary disconnect of
HVAC unit?
o The dates below are flexible as they weather dependent. Because the project is
dependent on HVAC system service interruption the project should commence
no earlier than October 1, 2016 (unless the average daily temperature exceeds
85 degrees) if so then the project should be postponed until November 1, 2016
at the latest, regardless of the average daily temperature). Because of this
flexibility the allowed time frame for substantial completion will be 90 days after
the Notice to Proceed and final completion will be 180 days.
e Will the test cut results be posted?
oO Bidders will be responsible for including cost associated with Asbestos
sampling. Do not include cost of removal at this time as we are unsure of
asbestos presence. We require the use of a State Licensed Consultant and/or
Contractor to perform the tests. Attached to this Addendum item is the State’s
Licensed Asbestos Abatement Contractors and Consultants list.