Apply rubber membrane under all roofing units and new RPI walkway pads with
sleepers above to mount the roafing units.
Apply RPI walkway pads from the door entrance and all the way around the
large units and both AC units. Note, the walkway pads will have 1” spacing
in between each to allow water to flow to the drain.
The roof units will be raised and reattached by J. Lawrence Hall.
8. Waste disposal:
® The work areas shall be kept neat and clean on a daily basis.
e An on site container will be used for disposal of tear off materials.
® The container will be set on planks to prevent damage.
e The location of the container to be determined at a later time.
*® The container shall remain on the job site until the work has been
completed.
9. General notes:
e Contractor to provide sanitary facilities for the duration of the project
for the work crew.
® All exterior work areas shall be thoroughly cleaned upon completian of the
job.
® Follow ali existing OSHA regulations as mandated by 29 CFR 1926 for the
construction industry.
e® All work to be done in a workmanlike manner in accordance with the standard
practices,
@ Also followed are special considerations set forth by the manufacturer for
the application of the specific product line.
® We maintain a current General Liability and Workman's Compensation
Insurance policy. A copy of this policy will be sent to you to verify our
coverage if requested.
* Lecal and national affiliations: ® Certifications:
“National Association of Home Alcoa Master Contractor
Builders and Remodelers” Mastic Master Contractor
“National Roofing Contractors RPI Certified EPDM Applicator
Associaticn” Certainteed Master Shingle
“Greater Nashua Chamber of Commerce” Applicator
VELUX Certified Installer
VSI Certified Installer
Installation Masters Installer
Therma-Tru Certified Installer
EPA Lead Safe Remodeler
Factory Certified Comfort Plus
Dealer