Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/5/2016 - P92

Finance Committee - Agenda - 10/5/2016 - P92

By dnadmin on Mon, 11/07/2022 - 09:49
Document Date
Wed, 10/05/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/05/2016 - 00:00
Page Number
92
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100520…

EXHIBIT B

PHASE II - Construction Documents (90%-100% Submittal)

Objectives:
e Upon Client approval, the design team shall finalize the construction documents in
technical detail.
e The design team will submit 90% construction documents package to the appropriate
agencies for review, revisions and approval.
e The design team will present the client with 100% construction document package for
construction purposes.

ILa— Skate Park Design Development Meeting (phone conference)
e Ifnecessary, the Client and design team will discuss the review comments for the 90%
construction document package and the actions needed to address the comments.
e® Upon conclusion of the phone conference, the client will prow ide a written notice to
proceed.

I.b-— 90% Construction Drawings

e The design team will provide 90% Constructior®
e Typically in addition to the review comments.
the 90% construction drawings.

a. Cover Sheet: General project informa,
b. Site Plan: An overall plan showing thet
existing features requiring additional consi

c. 3 Dimensional Graphic: Af (
with terrain callouts and det: i

d. Surface Grading & Drat es /

locations and swales needed tov “avey ‘timsn elevations and direction of flow. Additionally
finish grade contours Wun eshow.. ergund the Skate park depicting proposed grading needed
kK “to the: existing grade.

All necessary elevations, slopes, lengths, pumps, drains and
outfall locations neé...:4 for tht proposed drainage system.

f. Concrete Plan: Typ © slostition, finish and color of all of the concrete.

g. Coping Plan: Type, lication, finish and color of all coping and metal components.

h. Cross Sections: Multiple dimensioned vertical sections cutting through all terrain
elements within the Skate park.

m. Details: Standard and custom construction detailing for all master plan improvements,
including but not limited to perimeter sidewalk and parking lot.

ILe— 100% Construction Documents Meeting (phone conference)
e The Client and lead designer will discuss the review comments for the 90% construction
document package and the actions needed to address the comments.
e Upon conclusion of the phone conference, the client will provide a written notice to
proceed.

Artisan Skateparks
4600 Tamarack Dr., Kitty Hawk, NC, 27949
Andy Duck (252)202-1333, Fax (252)261-1184
artisanskateparks.com

Page Image
Finance Committee - Agenda - 10/5/2016 - P92

Footer menu

  • Contact