Moisture mitigation, if selected, will be installed at this point in order to seal beneath partitions
and millwork. Next phase will be framing of new metal stud partitions, which will frame te the
waffle slab grid, unless Alternate No. 2 Aluminum Storefront is selected. in that case, due to
the lead time, we will proceed with rough MEP’s throughout the space.
Insulation, drywall and prime painting will follow rough-ins and inspections. Acoustic ceiling
grid, doors, hardware, windows, and millwork/trim are installed next, and then finish paint and
finish. Final work consists of flooring, TAB, final clean and punchlist.
As you can see, the construction schedule, which we develop on MS Project software, will be
somewhat dependent on the selection of alternates, if any.
We look forward to delivering this project to you on time and on budget and in our trademark
“user-friendly” fashion. it will be a space in which we all can take pride and which the public
can enjoy for years to come.
We thank you for the opportunity to bid
Sincerely,
Judith A. Pletroniro John Ff. pielronire
John Pietroniro, LEED AP BD+C
President
IAPS Y
Judith Pietroniro, Managing Member
CEO
VRC re reg
OE CEO aT Maat
furhth op
CLUE Semis ee
603.831.5060
Francestown, NH 03043