Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/5/2016 - P6

Finance Committee - Agenda - 10/5/2016 - P6

By dnadmin on Mon, 11/07/2022 - 09:48
Document Date
Wed, 10/05/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/05/2016 - 00:00
Page Number
6
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100520…

Grappone Ford
Sree
Office: 603-224-2501

Selected Options

oute 3A, Bow, New Hampshire, 033043104

2017 E-350 Cutaway, SD Chassis
SD Chassis 138" WB SRW Base(E3F)

Code Description MSRP
Base Vehicle
ESF Base Vehicle Price (E3F} _ $30,445.00
Packages
780A Order Code 780A NC
Powertrain
99S Engine: 6.8L EF) Triton V10 Included
44P Transmission: Elactronic 6-Speed Included
Automatic wi0D
tncludes tow haul.
XE6 Limited Slip w/4.10 Axle Ratio $270.00
20X GVWR: 10,060 Ib Payload Package Included
Wheels & Tires
T38 Tires: LT245/75Rx16E BSW AS Included
642 Wheels: 16° x 7" Steel Painted Gray Included
Seats & Seat Trim
214 Dual High Back Buckets Included
A Vinyl Seat Trim included
Other Options
PAINT Monotone Paint Application sTD
138WB 138” Wheelbase » STD
901 110V AC Outlet ® $100.00
Replaces iP mounted 12 powerpoint and lighter,
63M Heavy-Duty 155-Amp Alternator $80.00
S4E jalescopic Trailer Tow Mirrors w/Flat $230.00
ens
Manual with power adjust fat fans.
$03 Power Windows & Locks Group $465.00
inctudes 1-touch dawn power driver window.
587 included

Radio: ETR AM/FM Siterec/Dicgital
Clock

includes 2-speakers and audio input Jack.

Prices and content avallabillty ag shown are subject to chani
may vary {rom this estimate because of spacial local pricing

salesperson for the most current information,

Prepared by: George Harsin Date: 09/08/2018 | Price Level: 725

g¢ and should be treated as estimates only. Actual base vehicle, package and option pricing
» availability or pricing adjustments not reflected in the dealer's cormputer system. See

Page Image
Finance Committee - Agenda - 10/5/2016 - P6

Footer menu

  • Contact