Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/16/2016 - P97

Finance Committee - Agenda - 11/16/2016 - P97

By dnadmin on Mon, 11/07/2022 - 09:48
Document Date
Wed, 11/16/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/16/2016 - 00:00
Page Number
97
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111620…

September 2, 2016
Alfa Laval Quote No. USRIMPL-1558

Alfa Laval inc.
§400 Intemational Trade Drive
Richmond, VA 23231

Tel: +1 804- 222-5300
Fax: +1 804-236-1364
www.alfalaval.com

Subject: Nashua, NH WTP
Sludge Spiral Heat Exchanger

Alfa Laval is pleased to provide this budgetary quotation for Spiral Heat Exchanger for the referenced
Project.

Sludge Spiral Heat Exchanger
Alfa Laval Sludge Spiral Heat Exchanger with 150 ft? surface area, drop in replacement for Serial
No. 30112-68233.

Budget Price: $37,600 (for quantity one)

e Material of construction is carbon steel SA-516-70.

e Unit will be designed, Fabricated, Tested and Stamped in accordance with the ASME code
Section Vill, Div 1.

Qty. (2) 6” Carbon Steel 150# Flange, Sch. 40 Sludge Inlet and outlet nozzles.

Qty. (2) 6” Carbon Steel 150# Flange, Sch. 40 Hot Water Inlet and outlet nozzies.

1° Sludge continuous coil channel spacing with no obstructions (pins) through the sludge
channel. Tangential sludge entry to promote even disbursement of sludge across channel.
Qty. (1} Hinged cover for easy access to sludge channel. The water side is welded closed.
Qty. (1) 4” Cleanout port for easy access to sludge inlet.

Qty. (2) 2” NPT Backflush connections on Sludge connnections

Qty. (8) %” 3000# couplings (provisions for pressure and temp. gauges/sensors).

1 — 3/8” 3000# coupling drain per hot water channel spiral winding.

Qty. (1) 1” 3000# coupling sludge side drain located at the lowest point in cover.

Qty. (1) Hardcopy of approval drawing or electronic submittal and transmission.

Qty. (1) Hardcopy of standard format data book and e-mail submission.

Standard packaging for covered indoor storage up to 12 months.

Standard paint system. Surface preparation includes sandblasting in accordance to SSPC-
SP-6. External carbon steel surfaces, except machined surfaces of flanges, painted with

VJ
go

Page Image
Finance Committee - Agenda - 11/16/2016 - P97

Footer menu

  • Contact