Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 12/7/2016 - P91

Finance Committee - Agenda - 12/7/2016 - P91

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
91
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

§ 1.5.1. The Architect and the Architect’s consultants shall be deemed the authors aac-ovasces-of their respective
Instruments of Service, including the Drawings and $
otherreserved tights, includins copyrights-Specifications,. The Contractor, Subcontractors, Sub- Subcontractors, and
material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or
distribution to meet official regulatory requirements or for other purposes in connection with this Project is not to be
construed as publication in derogation of the Architect’s or Architect’s consultants’ reserved rights.

§ 2.1.2 The Owner shall furnish to the Contractor within fifteen-thirty days after receipt of a written request,
information necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic’s lien rights.
Such information shall include a correct statement of the record legal title to the property on which the Project is
located, usually referred to as the site, and the Owner’s interest therein.

PAGE 12

If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails
within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such
default or neglect with diligence and prompiness, the Owner may, without prejudice to other remedies the Owner
may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from
payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including
Owner’s expenses and compensation for the Architect’ s additional services made necessary by such default, neglect
or failure. Su A atta 7a
the-Architect-If payments then ¢ or ieveafter due the Contractor are not sufficient to cover or such amounts, "the
Contractor shall promptly pay the difference to the Owner.

PAGE 13

§ 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The
Contractor shall be solely responsible for, and have control over, construction means, methods, techniques,
sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract
Documents give other specific instructions concerning these matters. If the Contract Documents give specific
instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall
evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite
safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means,
methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the
Owner and Architect and shall not proceed will that portion of me Work without further written instructions from

Intentionally Omitted.

PAGE 28

Additions and Deletions Report for AIA Document A201™ — 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976,

1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and 2
International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 08:39:36 on 11/21/2016

under Order No.7150521749_1 which expires on 10/03/2017, and is not for resale.

User Notes: (844049242)

Page Image
Finance Committee - Agenda - 12/7/2016 - P91

Footer menu

  • Contact