Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 12/7/2016 - P38

Finance Committee - Agenda - 12/7/2016 - P38

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
38
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

§ 4.2 Payments
§ 4.2.1 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed.

§ 4.2.2 Payments are due and payable
(Paragraphs deleted)
within 30 days of the Construction Manager’s invoice.

ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES

§ 5.1 For the Construction Manager’s performance of the Work as described in Section 2.3, the Owner shall pay the
Construction Manager the Contract Sum in current funds. The Contract Sum is the Cost of the Work as defined in
Section 6.1.1 plus the Construction Manager’s Fee.

§ 5.1.1 The Construction Manager’s Fee:
(State a lump sum, percentage of Cost of the Work or other provision for determining the Construction Manager’s
Fee.)

The Construction Managers fee shall be 2.9% based on the costs of construction as defined in Article 6. The CM
fee shall be fixed as a lump sum at the establishment of the GMP

§ 5.1.2 The method of adjustment of the Construction Manager’s Fee for changes in the Work:

§ 5.1.3 Limitations, if any, on a Subcontractor’s overhead and profit for increases in the cost of its portion of the
Work:

§ 5.1.4 Rental rates for Construction Manager-owned equipment shall not exceed percent( %) of the standard
rate paid at the place of the Project.

§ 5.1.5 Unit prices, if any:
(Identify and state the unit price; state the quantity limitations, if any, to which the unit price will be applicable.)

Item Units and Limitations Price per Unit ($0.00)
TBD

§ 5.2 Guaranteed Maximum Price

§ 5.2.1 The Construction Manager guarantees that the Contract Sum shall not exceed the Guaranteed Maximum
Price set forth in the Guaranteed Maximum Price Amendment, as it is amended from time to time. To the extent the
Cost of the Work exceeds the Guaranteed Maximum Price, the Construction Manager shall bear such costs in excess
of the Guaranteed Maximum Price without reimbursement or additional compensation from the Owner.

(Insert specific provisions if the Construction Manager is to participate in any savings.)

Any project savings shall be returned to the owner at the compietion of the project.

§ 5.2.2 The Guaranteed Maximum Price is subject to additions and deductions by Change Order as provided in the
Contract Documents and the Date of Substantial Completion shall be subject to adjustment as provided in the
Contract Documents.

§ 5.3 Changes in the Work

§ 5.3.1 The Owner may, without invalidating the Contract, order changes in the Work within the general scope of
the Contract consisting of additions, deletions or other revisions. The Owner shall issue such changes in writing. The
Architect may make minor changes in the Work as provided in Section 7.4 of AIA Document A201—2007, General
Conditions of the Contract for Construction. The Construction Manager shall be entitled to an equitable adjustment
in the Contract Time as a result of changes in the Work.

AIA Document A133™ — 2009 (formerly A121™CMc — 2003). Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved.

Init. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® 9
Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
} This document was produced by AIA software at 14:07:26 on 11/18/2016 under Order No.7150521749_1 which expires on 10/03/2017, and is not for resale.

User Notes: (1936421746)

Page Image
Finance Committee - Agenda - 12/7/2016 - P38

Footer menu

  • Contact