on the approach and constraints for soil and groundwater (e.g., dewatered liquid) management
to reduce potential for exposure of workers and the public to known or assumed contaminated
environmental media and to maintain conditions that are protective of human health and the
environment. In developing the plan, VHB will:
¢ Collaborate with the designer (and/or construction manager) to identify areas of
impacted environmental media requiring special handling/management during
construction; and
e Identify management strategies for these media, such as excavation/handling/placement
protocols, stockpile management practices, and reuse/disposal options, as applicable.
The Plan will be provided in draft form to the Client and the New Hampshire Department of
Environmental Services (NHDES) for review/comment. VHB's scope of work provides for one
meeting with the Client and one meeting with the NHDES to review comments and discuss
revisions to the draft SGMP prior to finalization. It should be noted that in preparing the budget
estimate to provide these services, VHB has assumed that the construction manager or
contractor will be responsible for conducting sampling and analysis required for waste profiling
purposes (as may be required for off-site disposal) during construction activities.
COMPENSATION
VHB and its subconsultants will perform this Scope of Services on a time and materials basis.
The estimated Upset Limit for this Scope of Services is $225,365 including labor, overhead,
profit, direct expenses and subconsultants. VHB direct expenses and subconsultants will be
billed at their actual costs without markup. Any permit application fees or impact mitigation fees
are yet to be determined and are assumed to be paid directly by the City and are therefore not
included in this amendment.
VHB $ 211,365.00
Estimated Direct Expenses $ 4,000.00
Allowance for Asbestos Subconsultant (if needed) $ 5,000.00
Allowance for Archaeological Subconsultant (if needed) _$ _5.000.00
TOTAL: $ 225,365.00