The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301 = t: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
WORK HOURS TOTAL
TASK DESCRIPTION PM Structural PE Se PD iis HOURS
Segment 2 - Path & Riverbank Enhancements
2.1 - Substation Riverbank E&S Evaluation 8 24 I. ] 32
ll
I
Be Sot Lee pe Ope, or ee dee FL emiote| SREB Geet Tao Geile bce 24 ee diem O oat oe eee ee ee ee ee ee ee ee
a sees ee teed ee ee es ee ee ee) ee ee es get es es ee ee ee ee eee ee ee Oe ne ee ee i et es ee
TOTAL HOURS 8 0 24 0 0 32
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 3 $ 150.00 $ 1,200.00
Structural Engineer (Structural) 8] $ 185.00 5 .
Project Engineer (PE) 24 $ 130.00 $ 3,120.00
Sr, Project Designer | (Sr PD) 0 $ 105,00 5
Technical Coordinator (TC} 0 $ 100.00 $ .
| 32 | Total Fully Burdened Labor $ 4,320.00
Subconsultant S -
Expenses 5 100.00
Estimated Direct Costs $ 100,00
TOTAL ESTIMATED COST= $ 4,420.00
P:\4920 VHB - Nashua River Walk\Organization\Proposals\Final Engineering Design Proposai 05-11-22\Final Engineering
Estimate 05-11-22.xIsx 1 of 2