ITEMS NOT INCLUDED
1. More meetings than identified in basic and additional services.
2. Construction drawings and specifications. (Note: At this time the City has not
defined the scope or method of project delivery, or its phasing, which would dictate
the criteria of scope and extent of these construction documents). Segments 3, 4, 6
& 11-14 all other drawings and specs.
3, Changes to the final engineering designs that are a result of issued state, federal or
city permit conditions.
4. RFls as part of any ongoing project permit application process.
5. Coordination with the City CM regarding the scope, fees and budgets, and
scheduling of TTG’s final engineering design.
6. Work currently being performed by others.
FEE
We propose to invoice for our services on an hourly basis per the attached “Standard Fee
Schedule and Payment Terms” dated January 1, 2022. Invoices will be submitted monthly.
A total not-to-exceed budget for the scope of work identified as “basic” final engineering
design services is $286,340. The total allowance estimate for “additional” services to
support the final engineering design is $118,000.
Attachment A is a Fee Summary Sheet line iteming and totaling the fees for “basic” and
“additional” services.
Attachment B is a Fee Breakdown providing labor and expense estimates per the Scope of
Services for the “basic” and “additional” services.
SCHEDULE
To be determined with the City.
Final Engineering Oesign Proposai 05-11-22
4920
TURNER
GROUP