Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 6/14/2022 - P78

Board Of Aldermen - Agenda - 6/14/2022 - P78

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
78
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

13.7

13.8

13.9

13.10

Design the new floating dock and gangway system including intermediate supports.

Re-examine the “0.00 ft rise” river model with the final design pile features to
confirm conformance.

Use the river model to assess pile erosion and scour, ice, and woody/miscellaneous
debris loadings.

Prepare final design drawings and specifications for City review and approval.

Segment 14 — Renaissance Park Improvements

14.1

14.2

14.3

14.4

14.5

Coordinate final park layout with the City and Halvorson/Tighe & Bond to minimize
the length and extent of the river walls and river slope embankment.

Perform additional river modeling to verify river wall and embankment grading do
not violate the “0.00 ft rise” flood level criteria. Use the river model to determine
velocity, scour and erosion potential as parameters in designing the final
embankment surface treatment(s).

Design the structural and geotechnical aspects of the new river retaining wall
including any special support(s) over the existing 30-inch City stormwater drain line.

Design the geotechnical, hydraulic, and structural elements of the proposed river
embankment.

Prepare fina! design plans and specifications for City review and approval.

Segment 14 — Revised Water Street and Factory Street Parking Layout

No TTG final engineering required.

Permitting Support

TTG will provide permitting support to the City in the implementation of permit terms and
conditions within its final engineering design.

ADDITIONAL SERVICES

The following are considered additional services that are not considered final engineering
design; but, will be needed to complete the final engineering phase of this project:

Finat Engineering Design Proposal 05-11-22

4920

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P78

Footer menu

  • Contact