Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 6/14/2022 - P74

Board Of Aldermen - Agenda - 6/14/2022 - P74

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
74
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

EXHIBIT B
The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301 =: 603.228.1122 hiturner.com

May 11, 2022

Mr. Timothy Cummings

Director of Economic Development
City of Nashua

229 Main Street

Nashua, NH 03060

SUBJECT: Proposal for Engineering Design Services
Nashua Riverfront Development Project
Nashua, New Hampshire

Dear Mr. Cummings:

Per your request, The H.L. Turner Group Inc. (TTG) offers the following proposal to the City
of Nashua (City) to provide certain final engineering design in conjunction with the City’s
Nashua Riverfront Development Project.

As the City is aware, TTG has been part of the project design team providing overall project
flood resiliency engineering and structural engineering design for the elevated walkway
portions of the project. The basis for final engineering design is shown and described on the
VHB, February 2, 2022, Nashua Riverfront Preliminary Design Plans and in the Preliminary
Design Narrative that was submitted to the City on the same date.

The following Scope of Services presents a general description of the TTG final engineering
work and follows the project scope breakdown identified in the VHB Preliminary Design
Narrative. Attachment A to this proposal is a breakdown of the man-hour effort to
complete the engineering and CAD work to prepare the final engineering design plans.
Construction plans and technical specifications will be prepared once permit comments are
received from the required regulatory agencies and the City’s Construction Manager (CM)
comments on the final engineering plans. The extent of comments is unknown at this time.
An allowance will be identified and carried in the TTG fee estimate.

SCOPE OF SERVICES

The following are considered basic services for the final design engineering scope:

Segment 1 — Cotten Mill Bridge ADA Ramp

No TTG final engineering required.

Final Engineering Design Proposal 05-11-22 4920 1

ARCHITECTS = ENGINEERS ® BUILDING SCIENTISTS

©Copyright 2022

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P74

Footer menu

  • Contact