Document Date
Meeting Description
Document Type
Meeting Date
Page Number
25
ORDINANCE O-22-023
[a] Up to 3 floors (per riser): $440150.
[b] Add per floor beyond 3 add: $5575.
{71[6] Carbon dioxide systems (per system): $220.
{$}[7] Clean agent extinguishing systems (per system): $220.
{91[8] Dry chemical systems (per system): $130.
[a] f#1—_Service station pump protection: $400150.
{101[9] Wet chemical systems_or commercial kitchen suppression
systems, each: $449150.
HtH[10]Fire pump installation: $275350.
(c) Modification to existing suppression systems (each system):
[1] Application fee: $20.
[2] Water and/or foam systems (all types):
[a] One to six heads (addition_or relocation of heads):
$3045.
[b] Seven to 20 heads (addition or relocation of heads):
$H40150.
Page Image
