Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
TASK DESCRIPTION WORK HOURS TOTAL
PM Structural PE Sr PD Te HOURS
Segment 13 - 4 Water Street Boardwalk eee. eta
13.1 - Boardwalk River Piles & Building
FConnections é a4 e : : we
13.2 - Boardwalk Structural Details 4 16 4 zZ 26
13.3 - Expanded Boardwalk Design Coordination ‘ 18 4 2 0
13.4 - Design Expanded Boardwalk Section 4 20 4 8 2
13.5 - Design Retaining Wall{s) & River Plies for
Expanded Boardwalk Section : 2 2 16 oy
13.6 - Design Piles - New Floating Dock 2 16 Fi 20
13.7 - Design the New Floating Dock & Gangway 2 16 18
System Including Intermediate Supports
13.8 - Re-examine Flood Rise Criteria with
Final Pile(s} Layout 24 =o.
13.9 - Assess Pile Erosion/Scour tce & Pr 12 4 is
Woody/Miscellaneous Debris Loadings
210 - D
13.10 - Prepare Final Design Drawings & 8 40 16 140 12
Specifications
FLOR Galt AL RE “4a a7 7 pra one oan Oe Ware. COUT bre Oia rp on a
Nee ae ca ea a ER 64 soe LS 72 BRL 78 Se 2 er e236 SY
TOTAL HOURS 44 172 72 176 26 490
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 44 $ 150.00 $ 6,600.00
Structural Engineer (Structural) 172 $ 185.00 $ 31,820.00
Project Engineer (PE} 72 $ 130.00 $ 9,360.00
Sr. Project Designer i (Sr PD} 176 $ 105.00 $ 18,480.00
Technical Coordinator (TC) 26 $ 160.00 $ 2,600.00
{ 490 Total Fully Burdened Labor $ 68,860.00
Subconsultant $ :
Expenses S 400.00
Estimated Direct Costs 5 400.00
TOTAL ESTIMATED COST = $ 69,260.00