The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t: 693.226.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
§/11/2022
TASK DESCRIPTION WORKNEORS neta
PM Structural PE SrPD Tc HOURS
Segment 12 - Bicentennial Park Renovation
12.1 - Determine Park - 4 Water Street Interface 4 16 4 2 26
2.2 - Design R ing W d i
1 esign Retaining Wall and Other Foundation 3 Ba 16 9 a4
Structures
cel Evaluate River Erosion & Scour at Modified 4 16 > 22
Retaining Wail
12.4 - Prepare Final Drawings & Specifications 2 16 4 24 2 48
TOTAL HOURS 12 56 20 44 8 140
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 12 $ 150.00 $1,800.00
Structural Engineer (Structural) 56 $5 185.00 $ 10,360.00
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PO) 44 § 105.00 $ 4,620.00
Technical Coordinator {TC} 8 § 100.00 S 800.00
140 Total Fully Burdened Labor $ 20,180.00
Subconsultant
Expenses
Estimated Olrect Costs
TOTAL ESTIMATED COST =
$ -
$ 200.00
$ 200.00
$ 20,380.00