Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 8/9/2022 - P77

Board Of Aldermen - Agenda - 8/9/2022 - P77

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
77
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t 603.228.1122 hiturner.com

Nashua Riverfront Development Project

Final Engineering Oesign

5/11/2022
TASK DESCRIPTION WORK HOURS UO
PM Structural PE Sr PD Tc HOURS
Segment3-SubstationScreening | faa
3.1 - Metal Screening Structure 4 24 40 2 70
3.2 - Foundation Design 8 a 8
Preliminary (completed) 8 36 2 46
Final Design 8 24 2 34
3.3 - Flood Resiliency Evaluation 8 24 2 34
od ee ee eee
84 8 192
‘aca nel naan aaa Carian Wa ee ee em mm mw
TOTAL HOURS 36 84 24 40 8 192
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 36 § 150.00 S$ 5,400.00
Structural Engineer (Structural} 84 § 185.00 $ 15,540.00
Project Engineer (PE) 24 $ 130.00 § 3,120.00
Sr, Project Designer | (Sr PD) 40 § 105.00 § 4,200,00
Technical Coordinator (TC) 8 5 100.00 5 800.00
192 Total Fully Burdened Labor $ 29,060.00
Geotech Subconsultant $§ -
Expenses $ 150.00
Estimated Direct Costs $ 150.00
TOTAL ESTIMATED COST= $ 29,210.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P77

Footer menu

  • Contact