The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Oesign
5/11/2022
TASK DESCRIPTION WORK HOURS UO
PM Structural PE Sr PD Tc HOURS
Segment3-SubstationScreening | faa
3.1 - Metal Screening Structure 4 24 40 2 70
3.2 - Foundation Design 8 a 8
Preliminary (completed) 8 36 2 46
Final Design 8 24 2 34
3.3 - Flood Resiliency Evaluation 8 24 2 34
od ee ee eee
84 8 192
‘aca nel naan aaa Carian Wa ee ee em mm mw
TOTAL HOURS 36 84 24 40 8 192
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 36 § 150.00 S$ 5,400.00
Structural Engineer (Structural} 84 § 185.00 $ 15,540.00
Project Engineer (PE) 24 $ 130.00 § 3,120.00
Sr, Project Designer | (Sr PD) 40 § 105.00 § 4,200,00
Technical Coordinator (TC) 8 5 100.00 5 800.00
192 Total Fully Burdened Labor $ 29,060.00
Geotech Subconsultant $§ -
Expenses $ 150.00
Estimated Direct Costs $ 150.00
TOTAL ESTIMATED COST= $ 29,210.00