The H.L. Turner Group Inc.
27 Locke Read Concord, NH 03301
t: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
WORK HOURS TOTAL
TASKIDESCHIFHON PM Structural PE SrPD Tc HOURS
Segment 2 - Path & Riverbank Enhancements
2.1 - Substation Riverbank E&S Evaluation 8 24 32
Pe OER ess ERY UAE SL ORB ee pea 0 SMh [oan 2a en OMSL RON RIE 732 — 5
TOTAL HOURS 8 0 24 0 ft) 32
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 3 $ 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ -
Project Engineer (PE) 24 § 130.60 $ 3,120.00
Sr, Project Designer | (Sr PD) 0 $ 105.00 S -
Technical Coordinator (TC) 0 5 100.00 $ .
| 32 Total Fully Burdened Labor $ 4,320.00
Subconsultant $ .
Expenses 5 100.00
Estimated Direct Costs
TOTAL ESTIMATED COST =
$ 100.00
$ 4,420,00
P:\4920 VHB - Nashua River Waik\Organization\Proposais\Final Engineering Design Proposal 05-11-22\Final Engineering
Estimate 05-11-22.xlsx
1of2