Franklin Street Genesis & History (cont’d)
¢ Brentwood Academy moved into its spaces on the third floor at the
beginning of the school year. Since the 2"? floor couldn’t be used,
only the pre-school classrooms from Broad St Elementary were
moved to Franklin Street (1% floor, with OT/PT in the basement).
¢ The need to provide an alternative emergency egress for the
Brentwood Academy was originally the driving force for this bond
request. Other facility issues requiring upgrades (identified in the
Harriman A/E assessment) include ADA compliance in restrooms,
stairwells and building access; roof replacement; flooring
replacement; and asbestos abatement.