Finance Committee - Agenda - 5/4/2022 - P74

By dnadmin on Sun, 11/06/2022 - 21:42
Document Date
Fri, 04/29/2022 - 14:39
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/04/2022 - 00:00
Page Number
74
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050420…

April 18, 2022

Matthew Franz, P.E.

City of Nashua

Engineering Department

Viaemail: = FranzM@NashuaNH.gov

Dear Matthew,

Beck & Bellucci, Inc. (B&B) is please to provide this quote to supply and install a 120 foot long by 6-
foot-wide pedestrian bridge across the Nashua Canal behind ‘The Nashua High School. As we
discussed, the bridge we are offering was purchased new in 2020 and has been in use in the Town of
Peterborough since that time. We believe the bridge will be available for installation at your location
around mid-June of this year. The bridge is constructed of weathering steel and has a 3”x8” pressure
treated wood deck.

Per your request, we are also providing a price to remove the existing 82 foot long by |0-foot-wide
pedestrian bridge super structure. This work would be done immediately following the installation of
the new bridge to avoid additional mobilization costs associated with doing the work at a later date.
We understand Nashua employees will handle disposal of the old bridge once it is staged on land.

We have prepared and included a sketch showing the proposed location of the new bridge and our plan
for completing the work with minimum disturbance to the area.

To provide the work described above we propose the following Scope of Work:
Item | Bridge Installation
e Mobilize equipment suitable for the work, and;

e Supply and install one 120-foot-long by 6-foot-wide used pedestrian bridge.

Item 2 Existing Bridge Removal
e Perform minor demolition such as removing hand rails to lighten the bridge;

e Disconnect the superstructure from the existing abutments;

e Install bracing to prepare the bridge for lifting;

Install the necessary rigging, and;

e Remove the bridge and place il on the ground within reach of our crane.

Our Scope of Work does not include the following necessary work:
e Remove exiling power feeding the strect light at the path intersection;

e Preparation of a 30-foot wide by 30-foot-long level and stable crane pad as shown on our plan;
e Installation of abutments;

e Earthwork to tie (he new bridge into the existing trails, and;

e Any required permits,

P.O. BOX 429, 10 SALISBURY ROAD FRANKLIN, NH 03235
(603) 934-5236 FAX (603) 934-7044
An Equal Opportunity Employer