Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P262

Board Of Aldermen - Agenda - 4/12/2022 - P262

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
262
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

SECTION 02920
LOAMING AND SEEDING
PART 1 —- GENERAL
1.01 DESCRIPTION OF WORK:

A. This section covers all labor, materials, and equipment necessary to do all loaming,
seeding and related work for miscellaneous areas disturbed by roadway and sidewalk

construction and as herein specified.

Note: Loaming and seeding for miscellaneous areas disturbed by roadway and

sidewalk construction is subsidiary to the sidewalk items of work.
1.02 RELATED WORK:
A. Section 02300 - EARTHWORK
B. Section 02370 — EROSION CONTROL

PART 2-— PRODUCTS
2.01 MATERIALS:

A. Loam for disturbed areas shall comply with the following
requirements.

.Topsoil for use in general lawn areas and planting beds shall
conform to the following grain size distribution for material
passing the #10 sieve:

U.S. Sieve No. % Passing by Weight
Minimum
10 100 ---
20 78 100
40 60 85
100 38 60
270 22 35
0.002 mm 2 5

Maximum

Natural loam not conforming to above shall be treated by the Contractor to
meet this specification. Cost of amendment to the loam shall be the

Contractor's responsibility.

B. Fertilizer:

1. Fertilizer shall be commercial fertilizer, 10-10-10 fertilizer mixture containing

at least 40 percent of organic nitrogen.
C. Mulch:

1. Materials to be used in mulching shall be hay, straw or wood fiber mulch.

2022 Sewer Replacement Project
Nashua, NH

Loam and Seed
02920-1

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P262

Footer menu

  • Contact