Document Date
Meeting Description
Document Type
Meeting Date
Page Number
240
Public Works Association (APWA):
Electric Red
Gas & Oil Yellow
Communications Orange
Water Blue
Sewer & Drain Green
PART 3 - EXECUTION
3.01 INSTALLATION:
A. — Tracer tape shall be installed directly above the pipe or conduit it is to identify,
approximately 12 inches below the proposed ground surface.
B. — The Contractor shall follow the manufacturer's recommendations for installation of
the tape, as approved by the Engineer.
END OF SECTION
2022 Sewer Replacement Project Tracer Tape
Nashua, NH 02518-2
Page Image
