Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P234

Board Of Aldermen - Agenda - 4/12/2022 - P234

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
234
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

SECTION 02370

EROSION CONTROL
PART 1 —- GENERAL
1.01 WORK INCLUDED:
A. Provide temporary erosion control for the entire duration of project in accordance with
plans, specifications.
1.02 RELATED WORK:
A. Section 02300: EARTHWORK
B. Section 02745: ROAD RESTORATION
C. Section 02920: LOAMING AND SEEDING
1.03 SITE CONDITION:
A. All soil erosion and sediment control measures to be in accordance with standards and

specifications thereof in "Stormwater Management, and Erosion and Sediment Control
Handbook for Urban and Developing Areas in New Hampshire," April 1997, prepared
by Rockingham County Conservation District for NHDES in cooperation with USDA-
SCS.

B. The work area shall be graded, shaped, and otherwise drained in such a manner as to
minimize soil erosion, siltation of drainage channels, damage to existing vegetation,
and damage to property outside the limits of the work area. Silt fences, hay bales
and/or detention basins will be necessary to accomplish this end.

PART 2-— PRODUCTS

2.01

MATERIALS:

A. Stabilized Construction Entrance:

Stabilized construction entrance shall conform to the plans and requirements of the
“Erosion and Sediment Control Design Handbook for Developing Areas of New
Hampshire.”

B. SILTSACK®:

Sediment control devices at catch basins shall be SILTSACK® as manufactured by
Terrafix Geosynthetics, Inc., or approved equal.

2022 Sewer Replacement Project Erosion Control
Nashua, NH 02370-1

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P234

Footer menu

  • Contact