Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P208

Board Of Aldermen - Agenda - 4/12/2022 - P208

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
208
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

G. The Engineer will review the shop and working drawings as to their general
conformance with the design concept of the project and general compliance with the
information given in the Contract Documents. Corrections of comments made on the
drawings during the review do not relieve the Contractor from compliance with
requirements of the Contract Documents. The Contractor is responsible for:
confirming and correlating all quantities and dimensions; selecting fabrication
processes and techniques of construction; coordinating his work with that of all other
trades; and performing his work in a safe and satisfactory manner. The review of the
shop drawings is general and shall not relieve the Contractor of the responsibility for
details of design, dimensions, code compliance, etc., necessary for interfacing with
other components, proper fitting and construction of the work required by the
Contract and for achieving the specified performance.

H. With few exceptions, shop drawings will be reviewed and returned to the Contractor
within 15 days of submittal.

I. No material or equipment shall be purchased or fabricated especially for this Contract
nor shall the Contractor proceed with any portion of the work, the design and details
of which are dependent upon the design and details of equipment or other features for
which review is required, until the required shop and working drawings have been
submitted and reviewed by the Engineer as to their general conformance and
compliance with the project and its Contract Documents. All materials and work
involved in the construction shall then be as represented by said drawings.

J. Two copies of the shop and working drawings and/or catalog cuts will be returned to

the Contractor. The Contractor shall furnish additional copies of such drawings or
catalog cuts when he needs more than two copies or when so requested.

END OF SECTION