Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P205

Board Of Aldermen - Agenda - 4/12/2022 - P205

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
205
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

Measurement:

Message boards, if ordered by the City, shall be measured by the WEEK for
message boards furnished and maintained, complete and as directed by the
Engineer.

Payment:
The contract price for ITEM 25 shall constitute full compensation for the cost

to provide electronic message boards including all labor and equipment
necessary to install and maintain the message boards in working order during
the time period directed by the Engineer, and as specified herein.

D. TEST PIT
Measurement:
The quantity of test pits, if ordered by the Engineer, shall be measured by the
EACH under the various subdivisions of ITEM 26 (A and B).

Payment:
The accepted quantity of test pits shall be paid for at the contract unit price

under ITEM 26 (A and B), and shall constitute full compensation for the
cost to perform the test pit including all labor and equipment necessary
complete the work, including but not limited to removal of excess and
unsuitable materials at the City landfill, and all work incidental thereto and
not specifically included for payment under other items.

NOTE:

1. The restoration of the pavement and base course gravels shall be paid for
separately under the appropriate ROADWAY RESTORATION contract
items.

E. REMOVE & REINSTALL EXISTING FENCE
Measurement:
The quantity of existing fence removed and reinstalled under ITEM 27 shall be
measured by the LINEAR FOOT.

Payment:
The accepted quantity of fence removed and reinstalled shall be paid for at

the contract unit price under ITEM 27, and shall constitute full
compensation for the cost to carefully remove, store and reinstall the fence
including all labor and equipment necessary complete the work, and all
work incidental thereto.

Note: ITEM 27 shall be used only for the fencing to be removed and

reinstalled along Clement Street in the vicinity of SMH #8678 (See Plan
Sheet 4 of 18).

END OF SECTION

2022 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -18

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P205

Footer menu

  • Contact