NEW VERTICAL GRANITE CURB (STRAIGHT)
Measurement:
The quantity to be measured under ITEM 13B, New Vertical Granite Curb
(STRAIGHT), shall be measured by the LINEAR FOOT in accordance with
the Contract Drawings, directions from the Engineer, and as specified herein.
Payment:
The approved quantity of New Vertical Granite Curb (STRAIGHT) shall be
paid for at the contract unit price for ITEM 13B and shall be full compensation
for furnishing and installing new vertical granite curb including crushed gravel
base and all labor, tools and any other equipment necessary to complete the
work as specified in these Specifications and as directed by the Engineer.
NEW GRANITE CURB (SLOPED)
Measurement:
The quantity to be measured under ITEM 13C, New Vertical Granite Curb
(SLOPED), shall be measured by the LINEAR FOOT in accordance with the
Contract Drawings, directions from the Engineer, and as specified herein.
Payment:
The approved quantity of New Vertical Granite Curb (SLOPED) shall be paid
for at the contract unit price for ITEM 13C and shall be full compensation for
furnishing and installing new vertical granite curb including crushed gravel
base and all labor, tools and any other equipment necessary to complete the
work as specified in these Specifications and as directed by the Engineer.
K. LOAM AND SEED (6” Depth)
Measurement:
The quantity to be measured under ITEM 14, Loam and Seed, shall be
measured by the SQUARE YARD of disturbed landscape area within the pay
limits noted on the Contract Drawings, or as approved by the Engineer, and as
specified herein
Payment:
The accepted quantity of loam and seed shall be paid for at the contract unit
price under ITEM 14, and shall be full compensation for the installation of
preparation of the subgrade, the placement of 6-inches of approved loam, and
for seeding, mulching and fertilizing the disturbed area, including all labor,
tools and any other equipment necessary to complete the work as specified in
these Specifications and as directed by the Engineer.
L. REMOVE TREES
Measurement:
The quantity to be measured under the various subdivisions of ITEM 15 (A
thru C) for removal trees will be measured by the EACH as approved by the
Engineer.
2022 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 - 13