Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P191

Board Of Aldermen - Agenda - 4/12/2022 - P191

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
191
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

Payment:
The accepted quantity of asbestos sewer, asbestos drain or asbestos sewer

service pipe removed shall be paid for at the contract unit price under ITEM 3,
and shall constitute full compensation for removal and disposal of the existing
asbestos pipe of all sizes up to 18” diameter by specially trained and
competent personnel including handling, bagging and disposal of asbestos
containing materials (ACMs) at the City landfill, furnishing all protective gear
for personnel, materials, labor, tools, and equipment necessary to complete the
work, all as specified in these Specifications and as directed by the Engineer.

NOTE:

1. Properly bagged asbestos containing materials (ACMs) may be delivered
and disposed of at the Nashua Landfill. The tipping fee will be waived for
disposal of this material.

2. Removal and disposal of existing asbestos pipe shall be paid for under

ITEM 3 in addition to the payment under the various subdivisions of
ITEMS 1 (A thru L) and ITEMS 2 (A thru D).

D. 6” PVC CHIMNEY
Measurement:
The quantity to be measured under ITEM 4 will be the actual number of 6”
PVC Chimneys constructed by the VERTICAL FOOT, complete-in-place, as
specified in these Specifications and as directed by the Engineer.

Payment:

The accepted quantity of 6” PVC Chimneys constructed shall be paid for at the
contract unit price under ITEM 4, and shall be full compensation for the
removal and disposal of the existing chimney, and the construction of the new
chimney, including all pipe, fittings, miscellaneous forming and concrete, and
all labor, tools and any other equipment necessary to complete the work as
specified and as directed by the Engineer.

E. SANITARY WYE OR SEWER SERVICE SADDLE OR CORED OPENING
Measurement:
The quantity to be measured under the various subdivisions of ITEM 5 (A thru
E) will be the actual number of sanitary wyes, sewer service saddles or cored
openings constructed and measured by the EACH, complete-in-place, as
specified in these Specifications and as directed by the Engineer.

Payment:
The accepted quantity of wyes, sewer service saddles or cored openings

constructed shall be paid for at the contract unit price under the appropriate
subdivisions of ITEM 5 (A and E), and shall be full compensation for
furnishing and installing wyes, including all labor, tools and any other
equipment necessary to complete the work as specified and as directed by the
Engineer.

2022 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -4

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P191