B.
C.
POINT REPAIR OF EXISTING SEWER AND DRAINS
Measurement:
The quantity to be measured under the various subdivisions of ITEM 2 (A thru
D) will be the actual number of point repairs measured by the EACH,
complete-in-place, as specified in these Specifications and as directed by the
Engineer. The depth for pay items shall be measured from the existing grade to
the sewer pipe invert.
Payment:
The accepted quantity of point repair items shall be paid for at the contract unit
price under the appropriate subdivisions of ITEM 2 (A thru D) and shall
constitute full compensation for cutting, removal and disposal of the existing
damaged sewer or drain pipe up to 10 linear feet, the removal and disposal of
surplus material from the pipe bedding and sand blanket, the installation of a
new PVC sewer main of the appropriate size with specified couplings,
furnishing all materials, labor, tools, and equipment necessary to complete the
work, including but not limited to handling of existing wastewater flows, by-
pass pumping, excavation, backfill, removal and disposal of old pavement,
surplus material and other unsuitable materials at the City landfill, pipe
bedding and sand blanket, complete in place as indicated on the drawings
and/or as specified including all work incidental thereto and not specifically
included for payment under other items, all as specified in these Specifications
and as directed by the Engineer.
NOTE:
1. The length of the repair up to 10 linear feet shall be shall be measured as 10
linear feet, and paid as one (1) point repair. If in the opinion of the
Engineer the repair requires more than 10 linear feet of new pipe repair,
then the unit price will be increased by 10% for every foot of new point
repair in excess of 10 linear feet up to 20 linear feet in length. If the repair
exceeds 20 linear feet, the first 20 linear feet will be paid as two (2) point
repairs, and the remainder shall be paid at the unit price per foot under the
appropriate subdivision of Item 1 (A thru L).
The restoration of the pavement and base course gravels shall be paid for
separately under the appropriate ROADWAY RESTORATION contract
items.
IN
REMOVAL & DISPOSAL OF EXISTING ASBESTOS PIPE (ALL SIZES UP
TO 18” DIAMETER)
Measurement:
The quantity to be measured under ITEM 3 for removal and disposal of
existing asbestos pipe will be measured by the LINEAR FOOT along the
completed actual length of pipeline removed and properly disposed of at the
City landfill.
2022 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 - 3