  2. Board Of Aldermen - Agenda - 4/12/2022 - P183

Board Of Aldermen - Agenda - 4/12/2022 - P183

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
183
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

AAIDAMWBRWNH

Ce)
Nr oO°

SECTION 01110

CONTROL OF WORK AND MATERIALS

General

Hauling, Handling and Storage of Materials

Open Excavations

Maintenance of Traffic

Care and Protection of Property

Protection and Relocation of Existing Structures and Utilities
Maintenance of Flow

Rejected Materials and Defective Work

Sanitary Regulations

Site Investigation

Existing Utility Locations — Contractor’s Responsibility
Cutting, Fitting and Patching

1. General

Scope: The requirements under this section are applicable to all work completed under

this Contract.

2. Hauling, Handling and Storage of Materials

A.

B.

The Contractor shall, at his own expense, handle and haul all materials furnished by
him and shall remove any of his surplus materials at the completion of the work.

The Contractor shall provide suitable and adequate storage for equipment and
materials furnished by him that are liable to injury and shall be responsible for any
loss of or damage to any equipment or materials by theft, breakage, or otherwise.

All excavated materials and equipment to be incorporated in the Work shall be placed
so as not to injure any part of the Work or existing facilities and so that free access can
be had at all times to all parts of the Work and to all public utility installations in the
vicinity of the work. Materials and equipment shall be kept neatly piled and compactly
stored in such location as will cause a minimum of inconvenience to public travel and
adjoining owners, tenants and occupants.

The Contractor shall be responsible for all damages to the work under construction
during its progress and until final completion and acceptance even if progress
payments have been made under the Contract.

3. Open Excavations

A. If/where applicable, all open excavations shall be adequately safeguarded by
providing temporary barricades, caution signs, lights and other means to prevent
accidents to persons, and damage to property. The Contractor shall, at his own

2022 Sewer Replacement Project Control of Work and Materials

Nashua, NH 01110-1