Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P101

Board Of Aldermen - Agenda - 4/12/2022 - P101

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
101
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the day of in the year 2022 by and between
the City of Nashua, New Hampshire (hereinafter called OWNER) and
and its successors, transferees and assignees together hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:

The scheduled work for the 2022 Sewer Replacement Project consists of approximately 3880 linear feet of
sewer and drain line replacement on Blanchard Street, Clement Street, Donna Street, Fairview Ave, Kendrick
Street, Kern Drive, Lincoln Park, Pike Street, Sunshine Court, and 12" Street. Work includes sewer and drain
line replacement, replacement of sewer service connections, replacement of sewer manholes and catch
basins, and miscellaneous other sewer and roadway trench patching items. In addition, the work includes an
estimated forty (40) sewer or drain point repairs at various locations throughout the City, which will be
determined based on on-going pipeline CCTV video assessment currently underway.

ARTICLE 3 - ENGINEER
3.01 Division of Public Works

Engineering Department

9 Riverside Street

Nashua, NH 03062
is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and
responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.
ARTICLE 4 - CONTRACT TIMES

4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and Completion and
Readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

AG -1 of 7

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P101

Footer menu

  • Contact