i ¥ A
U2 iParametrics @mel
PROPOSAL FOR THE CITY OF NASHUA
ARPA ADMINISTRATIVE SERVICES
Operational Relief Fund Program
The Operational Relief Fund Program aims to help rebuild the local economy and is designed
7] to meet the needs of the City's small businesses. The Program provides grants to cover eltgible
COVID.19 expenditures made or planned through year-end 2021, including costs associated
with operating losses, costs of "business interruptions and disruptions," and expenses related
iParametrics
to public health actions for businesses,
BEFORE YOU GEF STARTED
Program Overview
required to be submitted with this application, and the application timeline and next steps.
Click here to view and download the Program Overview, which includes application instructions, the list of documents that are
General Entity Information
Legal Name of Entity *
Physical Street Address *
Entity Type *
City * Zip Code *
Program Compliance and Quality Assurance
The same Team Lead staff who provided quality assurance on similar US Treasury and other federal grant programs will serve the
City of Nashua. As guidance for the US Treasury Amencan Rescue Plan Act continues to evolve, the Act presents a unique nsk
profile. riddied with unknowns. The iParametrics GMS is designed to safeguard the City of Nashua against unspecified compliance
risk related to unrevealed US Treasury Guidance. Our analytics team stands ready to make updates to the system as new guidance
is established and released. Additionally, if requested by the City our team has the capability to conduct internal audits of all
applications accepted to ensure continual compliance and validate each submission received.
The iParametncs GMS is configured to move applications through the process, giving each application a pre-charted path from
application submission to eligibility review to award determination to closeout. These pre-determined stage gates increase program
efficiency and reduce errors, as controls are built in to ensure no application moves beyond a specific stage gate until all quality
control is complete, documents are uploaded, approvals are in place, etc.
PAGE 24